JSEA Library

22 approved master Job Safety and Environmental Analyses. Masters are locked — project copies carry site-specific hazards and controls.

Filter by category
JSEA 01

Site Establishment and Occupied-Property Set-Up

MEDIUM
Critical controls
  • Resident notification completed before works commence
  • Exclusion zones and signage installed
  • Emergency egress maintained at all times
Site Set-Up · Rev 1.0 · Approved
JSEA 02

Ladder Access and Use

HIGH
Critical controls
  • Ladder is last resort — height task assessment completed
  • Ladder tagged, inspected and secured at 4:1 pitch
  • Three points of contact maintained; no over-reaching
Working at Height · Rev 1.0 · Approved
JSEA 03

Mobile Scaffold Tower - Erection and Use

HIGH
Critical controls
  • Erected by competent person to manufacturer instructions
  • Outriggers deployed, castors locked, guardrails complete
  • Never moved while occupied
Working at Height · Rev 1.0 · Approved
JSEA 04

Static Scaffold Access (Third-Party Erected)

HIGH
Critical controls
  • Current green Scaftag verified before each use
  • No modification by SCS personnel
  • Defects reported and scaffold tagged out
Working at Height · Rev 1.0 · Approved
JSEA 05

EWP - Scissor Lift Access

HIGH
Critical controls
  • Operator holds current EWP competency
  • Pre-start inspection and rescue plan in place
  • Harness worn where required by manufacturer
Plant & Access · Rev 1.0 · Approved
JSEA 06

Surface Preparation - Scraping, Sanding and Feathering

HIGH
Critical controls
  • Pre-1980 coatings tested for lead before disturbance
  • H-class vacuum / on-tool extraction in use
  • RPE face-fit tested for dust exposure
Surface Preparation · Rev 1.0 · Approved
JSEA 07

Water Blasting - High-Pressure Washing

HIGH
Critical controls
  • Exclusion zone established and maintained
  • Electrical isolation / protection of services
  • No lance directed at any person
Surface Preparation · Rev 1.0 · Approved
JSEA 08

Lead-Based Paint Testing and Risk Assessment

HIGH
Critical controls
  • All pre-1980 substrates tested prior to disturbance
  • Results recorded in project H&S file
  • No disturbance until control method confirmed
Hazardous Substances · Rev 1.0 · Approved
JSEA 09

Lead Paint Removal and Containment

CRITICAL
Critical controls
  • Full containment and negative-pressure where specified
  • Face-fit tested P3 RPE and decontamination facility
  • Residents and vulnerable persons excluded from zone
Hazardous Substances · Rev 1.0 · Approved
JSEA 10

Crystalline Silica Dust - Plaster and Stucco Sanding

CRITICAL
Critical controls
  • No uncontrolled dry cutting or sanding
  • On-tool H-class extraction or wet suppression
  • Face-fit tested RPE and health monitoring current
Hazardous Substances · Rev 1.0 · Approved
JSEA 11

Solid Plaster - Stucco Application - Exterior

MEDIUM
Critical controls
  • Compliant access platform in place (no ladder work)
  • Mixer guarding in place and isolation before clearing
  • Cement burn controls and washing facilities available
Plastering · Rev 1.0 · Approved
JSEA 12

Interior Plastering, Stopping and Skimming

MEDIUM
Critical controls
  • Dust control and occupant separation in occupied homes
  • Stilts prohibited unless authorised with clear floor
  • Ventilation maintained during drying
Plastering · Rev 1.0 · Approved
JSEA 13

Texture Coating Application

MEDIUM
Critical controls
  • Pre-1990 texture assessed for ACM before disturbance
  • Overspray containment established
  • Substance SDS reviewed and controls applied
Coatings · Rev 1.0 · Approved
JSEA 14

Airless Spray Coating Application

HIGH
Critical controls
  • Tip guard fitted and trigger lock used
  • No hand in front of spray tip — injection injury protocol briefed
  • Ventilation / exclusion zone for vapour control
Coatings · Rev 1.0 · Approved
JSEA 15

Brush and Roller Painting - Interior

LOW
Critical controls
  • Ventilation maintained in occupied rooms
  • Safe access equipment (no chairs or furniture)
  • Resident and pet separation maintained
Coatings · Rev 1.0 · Approved
JSEA 16

Exterior High-Level Painting

HIGH
Critical controls
  • Edge protection or approved platform in place
  • Weather and wind limits observed
  • Exclusion zone below the work face
Working at Height · Rev 1.0 · Approved
JSEA 17

Hazardous Substances - Paints, Solvents and Thinners

HIGH
Critical controls
  • Current SDS available on site for every substance
  • Bunded, ventilated, segregated storage
  • Spill kit and fire extinguisher accessible
Hazardous Substances · Rev 1.0 · Approved
JSEA 18

Manual Handling - Materials and Equipment

MEDIUM
Critical controls
  • Mechanical aids used for loads over 20kg
  • Team lift for awkward or long loads
  • Clear access routes before lifting
General Work · Rev 1.0 · Approved
JSEA 19

Working in Occupied Homes - Resident and Vulnerable-Person Interface

HIGH
Critical controls
  • Vulnerable person assessment completed before entry
  • Physical separation of work zone from living areas
  • Emergency egress and resident comms maintained daily
Occupied Property · Rev 1.0 · Approved
JSEA 20

Working Near Live Electrical Services

CRITICAL
Critical controls
  • Isolation and lock-out where practicable
  • Minimum approach distances maintained from overhead lines
  • Only licensed electrical workers alter fittings
Critical Risk · Rev 1.0 · Approved
JSEA 21

Asbestos-Containing Materials (ACM) Encounter Protocol

CRITICAL
Critical controls
  • STOP WORK immediately on suspicion of ACM
  • Do not disturb — isolate and notify H&S Manager
  • Licensed asbestos assessor engaged before resuming
Critical Risk · Rev 1.0 · Approved
JSEA 22

Adverse Weather - Storm Response

HIGH
Critical controls
  • Daily forecast check with defined wind and rain stop limits
  • All height work ceases in high wind
  • Site secured before forecast event
Environment · Rev 1.0 · Approved