JSEA 14/SCS Health & Safety Management System
Airless Spray Coating Application
Coatings · Rev 1.0 · Approved master — controlled document
HIGH
Task steps, hazards and controls
Swipe or step through on mobile
| Step | Hazards | Controls |
|---|---|---|
| Set up and prime | High-pressure injection, hose failure | Inspect hoses, pressure rating check, tip guard, trigger lock |
| Spray application | Injection injury, vapour inhalation, overspray | Never point at persons, RPE, ventilate, mask adjacent property |
| Depressurise and flush | Solvent exposure, fire | Relieve pressure, earth container, no ignition sources, ventilate |
Step 1 of 3
Set up and prime
Hazards
High-pressure injection, hose failure
Critical controls
Inspect hoses, pressure rating check, tip guard, trigger lock
Critical controls
- Tip guard fitted and trigger lock used
- No hand in front of spray tip — injection injury protocol briefed
- Ventilation / exclusion zone for vapour control
Minimum PPE
A2P3 RPESpray hoodGlovesEye protectionCoveralls
Sign-on register
0 signature(s) this session
No workers signed on yet in this session.
