Specialised Contracting Solutions
3
JSEA 14/SCS Health & Safety Management System

Airless Spray Coating Application

Coatings · Rev 1.0 · Approved master — controlled document

HIGH

Task steps, hazards and controls

Swipe or step through on mobile

Step 1 of 3

Set up and prime

Hazards

High-pressure injection, hose failure

Critical controls

Inspect hoses, pressure rating check, tip guard, trigger lock

Critical controls

  • Tip guard fitted and trigger lock used
  • No hand in front of spray tip — injection injury protocol briefed
  • Ventilation / exclusion zone for vapour control

Minimum PPE

A2P3 RPESpray hoodGlovesEye protectionCoveralls

Sign-on register

0 signature(s) this session

No workers signed on yet in this session.