Specialised Contracting Solutions
3
JSEA RM-10/SCS Health & Safety Management System

Portable Electric & Hand Tools

Responsive Maintenance · Rev 1.0 · Approved master — controlled document

MEDIUM

Task steps, hazards and controls

Swipe or step through on mobile

Step 1 of 4

Pre-use inspection and power set-up

Hazards

Electric shock, damaged leads and plugs, overloaded circuits, occupant supply used without permission

Critical controls

Check tags and condition, RCD on the supply, agree the power point with the occupant, avoid daisy-chained leads, keep leads out of water

Critical controls

  • All tools and leads current test-and-tagged, RCD protection in use
  • Guards and dust extraction fitted and functioning
  • Damaged tools and leads removed from service immediately

Minimum PPE

Eye protectionHearing protectionGlovesP2 RPE where dust is generatedSafety footwear

Sign-on register

0 signature(s) this session

No workers signed on yet in this session.