JSEA 21/SCS Health & Safety Management System
Asbestos-Containing Materials (ACM) Encounter Protocol
Critical Risk · Rev 1.0 · Approved master — controlled document
CRITICAL
Task steps, hazards and controls
Swipe or step through on mobile
| Step | Hazards | Controls |
|---|---|---|
| Recognise suspect material | Asbestos fibre release | Stop work, leave material undisturbed, no cutting or sanding |
| Isolate and notify | Spread of fibres, occupant exposure | Barricade, sign, evacuate area, notify supervisor and H&S Manager |
| Clearance before resuming | Unauthorised resumption | Survey by licensed assessor, written clearance, revised JSEA and brief |
Step 1 of 3
Recognise suspect material
Hazards
Asbestos fibre release
Critical controls
Stop work, leave material undisturbed, no cutting or sanding
Critical controls
- STOP WORK immediately on suspicion of ACM
- Do not disturb — isolate and notify H&S Manager
- Licensed asbestos assessor engaged before resuming
Minimum PPE
P3 RPE (evacuation only)Disposable coveralls
Sign-on register
0 signature(s) this session
No workers signed on yet in this session.
