JSEA 09/SCS Health & Safety Management System
Lead Paint Removal and Containment
Hazardous Substances · Rev 1.0 · Approved master — controlled document
CRITICAL
Task steps, hazards and controls
Swipe or step through on mobile
| Step | Hazards | Controls |
|---|---|---|
| Establish containment | Spread of lead dust to occupants and soil | Sealed sheeting, ground protection, signage, resident notification |
| Removal works | Lead inhalation and ingestion | Wet methods, on-tool H-class extraction, no eating or smoking in zone |
| Decontamination and clearance | Residual contamination | Staged decon, H-class vacuum, wipe down, clearance check, hazardous waste disposal |
Step 1 of 3
Establish containment
Hazards
Spread of lead dust to occupants and soil
Critical controls
Sealed sheeting, ground protection, signage, resident notification
Critical controls
- Full containment and negative-pressure where specified
- Face-fit tested P3 RPE and decontamination facility
- Residents and vulnerable persons excluded from zone
Minimum PPE
P3 RPEDisposable coverallsGlovesBoot covers
Sign-on register
0 signature(s) this session
No workers signed on yet in this session.
