JSEA 15/SCS Health & Safety Management System
Brush and Roller Painting - Interior
Coatings · Rev 1.0 · Approved master — controlled document
LOW
Task steps, hazards and controls
Swipe or step through on mobile
| Step | Hazards | Controls |
|---|---|---|
| Prepare room | Trips, damage, resident interference | Clear access, drop sheets, signage, brief occupants |
| Painting | Repetitive strain, falls from hop-ups, vapour | Platform steps, rotate tasks, ventilate, low-VOC where available |
| Clean up | Slips, solvent exposure | Wash-up station, seal containers, remove waste daily |
Step 1 of 3
Prepare room
Hazards
Trips, damage, resident interference
Critical controls
Clear access, drop sheets, signage, brief occupants
Critical controls
- Ventilation maintained in occupied rooms
- Safe access equipment (no chairs or furniture)
- Resident and pet separation maintained
Minimum PPE
GlovesEye protectionP2 RPE if poorly ventilated
Sign-on register
0 signature(s) this session
No workers signed on yet in this session.
