Specialised Contracting Solutions
3
JSEA RM-15/SCS Health & Safety Management System

Unknown / Suspected Asbestos or Hazardous Building Materials

Responsive Maintenance · Rev 1.0 · Approved master — controlled document

CRITICAL

Task steps, hazards and controls

Swipe or step through on mobile

Step 1 of 4

Check building information before disturbing material

Hazards

Unknown asbestos containing material in linings, textured coatings, soffits, sheet cladding and vinyl; lead based paint

Critical controls

Confirm property/building age, confirm whether asbestos information has been supplied, review the asbestos register or survey where applicable, treat pre-2000 buildings as potentially containing ACM and pre-1980 coatings as potentially lead

Critical controls

  • Property information and asbestos information considered before any disturbance of material
  • STOP immediately and do not disturb further if suspect or unidentified material is encountered
  • Work does not recommence until assessment or information is obtained and controls agreed

Minimum PPE

Do not disturb — no PPE substitutes for stopping workP3 RPE and disposable coveralls only for controlled withdrawal

Sign-on register

0 signature(s) this session

No workers signed on yet in this session.