JSEA RM-04/SCS Health & Safety Management System

Exterior Plaster Repairs

Responsive Maintenance · Rev 1.0 · Approved master — controlled document

HIGH

Task steps, hazards and controls

Swipe or step through on mobile

Step 1 of 4

Assess the elevation, ground and access

Hazards

Falls from height, unstable or sloping ground, overhead power lines, public below

Critical controls

Assess access at the prestart, platform preferred over ladder, level and firm footing, maintain clearance from lines, barrier the area below

Critical controls

  • Safe work platform used where the task is higher risk or longer duration — ladders only for low-risk, short-duration work
  • Exclusion zone below all elevated work to control falling objects
  • Weather assessed before and during exterior work

Minimum PPE

Safety footwearHi-vis clothingHard hat where overhead hazards existEye protectionNitrile glovesP2 RPE