JSEA RM-07/SCS Health & Safety Management System
Exterior Painting
Responsive Maintenance · Rev 1.0 · Approved master — controlled document
HIGH
Task steps, hazards and controls
Swipe or step through on mobile
| Step | Hazards | Controls |
|---|---|---|
| Assess weather, elevation and access | Wind, rain, heat, falls from height, overhead lines, public below | Daily weather check, stop criteria agreed, platform preferred over ladder, clearance from live lines, barriers and signage below |
| Set up and protect the surroundings | Overspray and drips onto property and vehicles, trip hazards, damage to gardens | Sheet and mask, move or cover vehicles with the occupant's agreement, keep leads and equipment clear of paths |
| Apply coatings at height | Falls, dropped tools and tins, over-reaching, chemical contact | Three points of contact, tools and tins secured or in a holder, no over-reaching — reposition the access instead, gloves and goggles worn |
| Complete, inspect and clean down | Public contact with wet coatings, waste and washings, unattended equipment | Wet paint signage, contained wash-out, remove waste, secure and remove access equipment daily |
Step 1 of 4
Assess weather, elevation and access
Hazards
Wind, rain, heat, falls from height, overhead lines, public below
Critical controls
Daily weather check, stop criteria agreed, platform preferred over ladder, clearance from live lines, barriers and signage below
Critical controls
- Access method confirmed at the prestart — platform where higher risk or longer duration
- Exclusion zone below elevated work
- Work suspended in adverse weather
Minimum PPE
Safety footwearHi-vis clothingHard hat where overhead hazards existNitrile glovesSplash gogglesRPE per product SDS
Sign-on register
0 signature(s) this session
No workers signed on yet in this session.
