Specialised Contracting Solutions
3
JSEA RM-05/SCS Health & Safety Management System

Surface Preparation, Scraping & Sanding

Responsive Maintenance · Rev 1.0 · Approved master — controlled document

HIGH

Task steps, hazards and controls

Swipe or step through on mobile

Step 1 of 4

Identify the coating and substrate

Hazards

Lead based paint, asbestos containing textured coatings or sheet linings, silica in plaster and render

Critical controls

Check property age and information, apply JSEA RM-15 for suspect material, treat pre-1980 paint as lead until assessed, escalate for testing

Critical controls

  • Dust captured at source — H-class on-tool extraction or wet methods, never dry uncontrolled sanding
  • Pre-1980 coatings treated as potential lead paint until proven otherwise
  • Containment and clean-down on completion with a HEPA vacuum

Minimum PPE

P2/P3 particulate RPE (clean shaven, fit checked)Eye protectionDisposable coverallsGlovesSafety footwear

Sign-on register

0 signature(s) this session

No workers signed on yet in this session.