JSEA 16/SCS Health & Safety Management System
Exterior High-Level Painting
Working at Height · Rev 1.0 · Approved master — controlled document
HIGH
Task steps, hazards and controls
Swipe or step through on mobile
| Step | Hazards | Controls |
|---|---|---|
| Access planning | Fall from height, unstable access | Scaffold/EWP preferred, tagged access, daily inspection |
| Painting at height | Dropped objects, wind-blown spray, fatigue | Tool tethers, exclusion zone, stop at wind limits, hydration breaks |
| Pack down | Manual handling, dropped materials | Lower materials by hoist/hand line, team lift, secure site |
Step 1 of 3
Access planning
Hazards
Fall from height, unstable access
Critical controls
Scaffold/EWP preferred, tagged access, daily inspection
Critical controls
- Edge protection or approved platform in place
- Weather and wind limits observed
- Exclusion zone below the work face
Minimum PPE
Hard hatHi-visHarness where requiredSafety footwear
Sign-on register
0 signature(s) this session
No workers signed on yet in this session.
