SCS-HS-LEAD-001 / LEAD EXPOSURE MANAGEMENT
Daily Lead Control Verification
SCS-HS-FRM-LEAD-003 · REV 2.0 · 26 SEPTEMBER 2026
- STATUS
- CONTROLLED — CURRENT
- OWNER
- Health & Safety Lead
- APPROVED BY
- SCS Director / Officer
- SECTION
- 8 of 11
PEOPLESAFERSPACESSTRONGERTOGETHER
01
SECTION 01
Purpose
Pre-disturbance verification and end-of-shift / hand-back clearance for each day of lead work.
I have verified these controls on site today.
02
SECTION 02
Fields captured
| GROUP | FIELD | OPTIONS |
|---|---|---|
| Shift | Work area * | Free text |
| Shift | Method used today | Free text |
| Shift | Crew in control zone | Free text |
| End of shift | Waste bags / containers removed and route | Free text |
| End of shift | Comments / changes | Free text |
03
SECTION 03
Checks
PRE-DISTURBANCE
- Lead status and today's work method understood
- Containment / exclusion complete
- Residents, children and pets excluded
- H-class extraction serviceable — correct filter / bag, airflow checked
- RPE correct, fit test current, pre-use fit check done
- Handwashing / decon in place
- Protective clothing, gloves and eye protection worn
- Waste containers and labels ready
- Ventilation / airflow controlled
- Access / work-at-height controls in place
- Monitoring requirements and status checked
END OF SHIFT / HAND-BACK
- H-class vacuum and wet wipe completed
- Sheeting folded inward, bagged and labelled
- Wash-water captured — no discharge
- Tools cleaned / bagged
- Workers decontaminated
- Visual clearance before resident re-entry
- Area handed back to resident / occupant
Sign-off: Supervisor. Each completed record is audit-stamped with user, time, project and revision.
—
SECTION —
Document approval
| ROLE | NAME / POSITION | STATUS |
|---|---|---|
| Prepared / reviewed | Health & Safety Lead | REVIEWED |
| Approved | SCS Director / Officer | APPROVED |