SCS-HS-LEAD-001 / LEAD EXPOSURE MANAGEMENT
Lead Pre-Work Assessment & Permit to Proceed
SCS-HS-FRM-LEAD-001 · REV 2.0 · 26 SEPTEMBER 2026
- STATUS
- CONTROLLED — CURRENT
- OWNER
- Health & Safety Lead
- APPROVED BY
- SCS Director / Officer
- SECTION
- 6 of 11
PEOPLESAFERSPACESSTRONGERTOGETHER
01
SECTION 01
Purpose
Confirms lead status, method, controls, equipment and monitoring before any planned lead disturbance.
I authorise this work to proceed only by the approved method and controls above. Class D work is not authorised under this permit.
02
SECTION 02
Fields captured
| GROUP | FIELD | OPTIONS |
|---|---|---|
| Property & scope | Property / area * | Free text |
| Property & scope | Building age / era | Free text |
| Property & scope | Occupancy | Occupied / Unoccupied / Occupied — children / vulnerable residents / Public interface |
| Property & scope | Scope of lead disturbance * | Free text |
| Lead identification | Lead status * | CONFIRMED / PRESUMED / NOT DETECTED / UNKNOWN |
| Lead identification | Evidence / test reference | Free text |
| Lead identification | Asbestos check * | Asbestos survey / register checked — not present in work area / Presumed / suspect — HOLD / Not yet checked — HOLD |
| Method & class | Lead work class * | A — No / negligible disturbance / B — Controlled low-dust / C — Higher potential / mechanical / D — Outside SCS method (STOP) |
| Method & class | Approved work method * | Free text |
| Exposure factors | Duration, frequency, area, ventilation, people exposed | Free text |
| Monitoring decision | Monitoring decision | Not required — Class A/B, controls verified / Exposure monitoring required / Occupational-health review requested / Baseline BLL recommended by practitioner / Existing programme — status checked |
| Monitoring decision | Monitoring notes | Free text |
03
SECTION 03
Checks
CRITICAL CONTROLS CONFIRMED
- Containment / exclusion designed
- Resident notification completed
- H-class extraction available and serviced
- RPE selected under AS/NZS 1715, fit tests current
- Current SDS / TDS / manuals on site
- Waste and wash-water route confirmed
- Decon / handwashing facility arranged
- Workers have completed lead acknowledgement (FRM-LEAD-005)
Sign-off: Authorising supervisor / H&S Lead. Each completed record is audit-stamped with user, time, project and revision.
—