Specialised Contracting Solutions
3
NEW/SCS Health & Safety Management System

Job Builder

One continuous flow — job details, workers, risks, tasks, rescue plan and photos. Generate the documents at the end — the daily prestart is run on site on day one.

  1. 1Job details
  2. Workers
  3. Additional risks
  4. 4Tasks & JSEAs
  5. Emergency & rescue
  6. 6Photos
  7. Other documents
  8. 8Generate

Select safety plan type

One SCS system and document standard — the depth scales to the actual work.

Contract levelPrequalification / Tender SSSPRepresentative contract safety plan for prequalification and tender where properties are not yet allocated. Cloned into live site-specific SSSPs as work orders are issued.

Job details

Site, client and main contractor — captured once for every document in the pack

Required PPE & RPE register

Derived from the scope of works and the selected JSEAs — printed in the SSSP and confirmed at every prestart

Base site PPE — all workers and visitors
MANDATORY BASE
Mandatory on every SCS site
  • Steel-cap safety footwear
  • High-visibility vest or hi-vis workwear
  • Hard hat where overhead hazards or work above exist
  • Safety eyewear
  • Work gloves suited to the task
  • Sun protection and hydration for outdoor work
Painting, spraying, coatings and solvents
TASK SPECIFIC
Scope or tasks include painting, spray application, coatings or solvent use
  • A2P3 combination vapour and particulate RPE, or an air-fed spray hood
  • Nitrile chemical-resistant gloves
  • Chemical splash goggles
  • Disposable coveralls with hood
  • Barrier cream and skin-care regime
Plastering and compound mixing
TASK SPECIFIC
Scope or tasks include plastering, stopping or compound mixing
  • P2 dust mask for dry-mixing and sanding
  • Chemical splash goggles
  • Barrier cream and nitrile gloves
  • Knee protection for floor-level work

All PPE and RPE is supplied by SCS at no cost to the worker, must be correctly fitted before work starts and inspected at every prestart. Damaged or expired items are removed from service immediately. Tight-fitting respirators require a clean-shaven face and a fit check each time they are worn; harnesses and lanyards must carry a current inspection tag. Workers are trained in the selection, fitting, use, cleaning and storage of every item listed here. PPE is the last line of defence and never replaces higher-order controls in the hierarchy.

Workers on this job

Everyone listed here appears on the induction and JSEA sign-on registers

  • SCS Director / Officer
    Director / Site Supervisor
    INDUCTED

Additional site risks

0 flagged — anything marked YES is written into the SSSP and risk register

  • Occupied property — residents, children or pets on site
  • Vulnerable persons (elderly, mobility or health conditions)
  • Pre-1990 coatings — possible lead-based paint
  • Possible asbestos-containing material
  • Silica dust generating work (grinding, cutting, sanding)
  • Work above 3 metres or unprotected fall edge
  • Public interface — footpath, driveway, neighbouring property
  • Live electrical services or overhead lines
  • Confined or restricted access areas
  • Other PCBUs working alongside SCS
  • Underground services located and marked
  • Exposed / adverse weather conditions likely

Add tasks

0 selected — each task brings its approved hazards and controls with it

  • MEDIUM
  • HIGH
  • HIGH
  • HIGH
  • HIGH
  • HIGH
  • HIGH
  • HIGH
  • CRITICAL
  • CRITICAL
  • MEDIUM
  • MEDIUM
  • MEDIUM
  • HIGH
  • LOW
  • HIGH
  • HIGH
  • MEDIUM
  • HIGH
  • CRITICAL
  • CRITICAL
  • HIGH
  • MEDIUM
  • HIGH
  • MEDIUM
  • HIGH
  • HIGH
  • MEDIUM
  • HIGH
  • HIGH
  • HIGH
  • MEDIUM
  • MEDIUM
  • HIGH
  • HIGH
  • MEDIUM
  • CRITICAL
  • LOW
  • HIGH

Emergency and rescue plan

Built for Ground level only — edit any step before generating

Rescue sequence
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5

Site photos

Access, hazards, scaffold, assembly point — added as a photo appendix in the pack

Add other documents

The H&S Policy always leads the SSSP — the subcontractor agreement follows it. Tick anything else to include.

Contract documents
Document library — Level 1
Document library — Level 2
Document library — Level 4
Site hazard boards (A3)
SCS COMPLETE — company system

2 documents will be listed in the pack register and sent with transmissions. Upload your own manuals, procedures and boards in the Document Library — they appear here to select.

Ready to generate

These documents are created against the job number and held in the controlled file

Job
—
Site
—
Client
—
Main contractor
—
Workers
1 on the job
Risks flagged
0 of 12
Tasks / JSEAs
0 selected
Access & rescue
Ground level only
Photos
0 attached
Other documents
2 selected
Documents to be generated
  • Health, Safety and Wellbeing Policy (always first)
  • Major / Full Project SSSP
  • Subcontractor Agreement & Main Contractor Sign-Off
  • Project risk register
  • 0 project JSEAs referenced for planning; site sign-on at prestart
  • Emergency and rescue plan
  • Induction and worker register
  • Photo appendix
  • Attached document register (2)

Add a job number, job name, site address and at least one task before generating.

The rated risk register and a control plan for every risk are written automatically from this job's tasks, access method and flagged site risks.